Upland Roofing CollectiveGet matched with vetted Upland roofers in minutes.(909) 755-8991Free estimate

Note

What actually happens during a re-roof

Day by day, so nothing on your driveway comes as a surprise.

Or call (909) 755-8991
Note1 min readUpland, CA

Get quotes instead

Three questions, up to three contractors, nothing charged.

Or call (909) 755-8991

No cost · No pressure

Get quotes instead

Three questions, up to three contractors, nothing charged.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, fast, and no obligation to hire anyone.

Before the first day

Permit pulled, material delivered — usually to the driveway, sometimes onto the roof. Move cars, clear the drive, and take pictures off the walls upstairs.

Day one: tear-off

The loudest day. The old covering comes off, the deck is inspected, and any rotten sheathing is replaced at the rate agreed in the contract. This is the day the price can move, which is why that rate matters.

Day two: dry-in and covering

Underlayment, ice-and-water where required, drip edge, then the covering goes on from the eaves up. Flashings and penetrations are detailed as the crew reaches them.

Finishing

Ridge, ventilation, final flashing, then clean-up and a magnet run for nails. Walk it with the contractor before the final payment, and keep the paperwork.