Upland, CA
Find out what you are actually dealing with
Half the people who ask for a replacement need a repair, and a handful of the people who ask for a repair need a replacement. An hour on the roof sorts that out.
Describe the inspection job
Three questions, then the address. Up to three Upland contractors who do this work.
You are on the list.
No provider in Upland is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- A written report, not a verbal summary
- An estimated number of years left in the covering
- Whether the fee comes off the job if you proceed
- Whether the inspection includes going into the attic
- Photographs of anything they flag
Either way, ask for photographs. A report with pictures of your actual roof is worth ten times one with a tick-box condition rating.
Twice a year is the standard advice, and almost nobody does it. Once after the worst weather of the year is a reasonable compromise.
Ask for an estimated remaining life in years, and what would extend it. That answer is the useful part.
Locally
Close behind that: dry offshore wind that arrives all at once in autumn. They also drive ember risk, which is why vent screening and Class A assemblies matter more here than the colour of the covering.
About inspection here
Do you handle commercial buildings?
Yes. Commercial requests go to contractors who do low-slope and flat systems rather than to residential crews. Say so on the property question and it routes correctly.
Do I have to hire anyone?
Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.
Why three quotes and not one?
Because one price tells you nothing. Three tells you where the middle is, and the outliers are informative in both directions — the very cheapest is usually leaving something out, and the most expensive should be able to say what you are getting for it.
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Ready for a real number?
No cost. We email you once when a provider near you can take it on.
