Upland prices
Pricing a repair rather than a replacement
Most repair quotes fall into four or five recognisable bands. Knowing which band you are in stops you being surprised.
Be first in line
No company gets your details until you say yes to it by name.
You are on the list.
No provider in Upland is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Upland is built. No contractor is bound by them, and nobody can price a roof they have not stood on.
| Repair | Typical range | Notes |
|---|---|---|
| Emergency tarp-over | $400 – $1,200 | Stops the water tonight. It is not a repair. |
| Small leak, flashing or a few shingles | $475 – $1,400 | A pipe boot, a bit of step flashing, a handful of blown-off shingles. |
| Valley, chimney or skylight reflash | $925 – $3,100 | Where most leaks actually start. Rarely the shingles themselves. |
| Section replacement, one slope | $1,500 – $5,000 | New material on part of the roof. Colour matching is the hard part. |
| Rotten decking, per sheet replaced | $100 – $225 | Only found once the old covering is off. Always budget for some. |
| Structural repair with decking and framing | $3,700 – $12,000 | Long-running leaks get expensive because of what they soak, not what they break. |
What moves the price
- Warranty tier, which is really a question about who honours it in fifteen years
- Ventilation work, if the old roof was cooking itself from underneath
- How many old layers have to come off before the new one goes on
- Where you land in the season; crews discount when the phone is quiet
- Whether the valleys, drip edge and step flashing are being replaced or reused
Locally
Sun is the main wear here. Asphalt loses its oils, underlayment goes brittle, and sealant beads shrink away from the flashing.
If the repair quote is creeping toward a third of a replacement, get the replacement priced too before you decide.
These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Upland is built. No contractor is bound by them.
Questions about price
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
What happens to my information?
Your details are passed to up to three local roofing contractors so they can quote. That is the only use. You can ask us to delete them at any time, and there is a do-not-sell page for exactly that.
I have solar panels. What happens to them?
Panels have to be detached and reset. Budget for it separately and coordinate the two trades. Never put a new solar array on a roof with under ten years left.
Ready for a real number?
No cost. We email you once when a provider near you can take it on.